If your site is saturated after a downpour or the plumbing inspector gets called away to another job your contractor will be forced to postpone the concrete delivery.
Building raised floor on concrete slab.
Install it flat on the slab surface with the outside edge aligned against the side wall or the edge of the floor line.
Due to it s 6000 ft elevation the area can get significant snowfall in the winter.
Turn pt 2 x 6 on edge screw them to the outer perimeter of the wall.
This way the siding will be able to hang over the side of the slab an inch to prevent water from seeping under the bottom plate and into your shed.
Karl ludwig posted in general questions on august 5 2012 07 01am my wife and i just purchased a moderately sloping lot in northern arizona near flagstaff and we re in the initial stages of designing a roughly 1000 sq.
These will be the end sill plates that support the ends of the floor joists.
Raised floors are systems indicated for environments where there is a complex electrical and telecommunications infrastructure such as offices of enterprises.
An elevated or suspended concrete slab is most commonly found in multistory heavy use buildings such as parking garages or commercial offices.
Then rest your non pt 2 x 4 s on edge on the 2 x 6 s.
Then lay your plywood on top.
Build your slab the size of the shed floor.
Secure each length to the slab with concrete nails spaced approximately 32 inches apart and 8 to 12 inches from each end.
If the room is real large and you want to raise it high you can use the rim joist method.
The access floor solution consists of the panels fixed directly on pedestals thus creating voids between the substrate concrete slab and the floor.
Elevated floor system which is also termed as access floor system is a raised structural floor that is placed on a reinforced concrete slab.
The elevated floor system consists of a several panels as shown in figure 1 which are installed on vertical adjustable pedestals as it can be noticed in figure 2.
In other words if you are building an 8 12 shed then build an 8 12 slab.